Princess Alexia Wind Farm consists of 36 windmills with a combined capacity of 122 megawatts. That means electricity for 88,000 households. The wind farm is one of the largest wind farms on land in The Netherlands.
About the project
The windmills are a lot bigger than average. The mast of the mills is 98 meters high. When the sail is in the highest position, the height is even 150 meters. The Princess Alexia Wind Farm was built in 17 months. At the end of 2011 the construction started with the ground work and in August 2012 the first of the 36 windmills was erected. The first windmills delivered their current in November 2012 and in March 2013 the last windmill was installed.
Aratis has supervised the preparation and tendering of the engineering, construction and installation of the wind farm and was responsible for the contract management during the execution of the FIDIC contract for the wind turbines and of the UAV-GC contract for Civil Engineering and Electrical works (also called Balance of Plant).
Meet over coffee and discuss our future collaboration?
Whether you want to discuss a complex issue as a client or you are a professional who is looking for a serious change. Please contact us for a further introduction and a cup of coffee!