Nuon Wind & Eneco Wind
The project wind farm Slufterdam consists mainly of the removal of 18 existing wind farm structures, including the wind turbine foundations. After that, the construction can start of all the park roads, crane sites, SCADA infra, park cabling and customer substations. Together this is being calles the Balance of Plant. This will have to be done to be able to place wind turbines with a power of 4 MW each.
Contract management during implementation of UAV-GC contract
In collaboration with Nuon and Eneco, Aratis has supervised the preparation and procurement of the engineering, construction and installation of the wind farm and will be responsible for the contract management during the implementation of the UAV-GC contract for the Civil Engineering and Electrical works (also called Balance of Plant).
Mid 2017 started the execution phase. The delivery of the Balance or Plant was foreseen in mid 2018, after which the turbines can be installed to use them before the end of 2018.
Meet over coffee and discuss our future collaboration?
Whether you want to discuss a complex issue as a client or you are a professional who is looking for a serious change. Please contact us for a further introduction and a cup of coffee!